Project Name: Wanda Garden, Wudan Town, Wengniute Banner, Chifeng City, Inner Mongolia
Construction area: 9600 square meters
Product used: CFS 600/601
Device used: CFS-GDR850
The original foundation ground is the smooth surface of C30 concrete protoplasm, and the surface is partially pockmarked. In addition, during the construction period is encountering a strong cold current, the construction of the lowest temperature reached 15 degrees below zero.
The whole project went through 22 days. After grinding iron sheet and resin sheet and repairing potholes for many times, the surface layer of the original foundation concrete was basically smooth. After the curing material is rolled and coated twice, the knife marks on the original surface are basically covered, and the surface effect is bright and consistent.
pre-construction
After construction
Before and after construction, the effect contrasts sharply. The diamond crystal floor treated by CFS floor system is easy to clean and clean without maintenance cost, dust proof, pressure resistance, wear resistance, non-combustion, seepage resistance, corrosion resistance, brightness, environmental protection, frost and thaw resistance, weathering resistance.