Project Case|Hengshui Olive Oasis-Hoya Project Ground Renovation
Project name: Hengshui Olive Oasis-Hoya project ground renovation
Construction area: 46000 square meters
Product used: CFS drill crystal curing agent 600/601
Equipment:Driven planetary disc grinding machine CFS-GDR850
Heavy-duty high-efficiency grinding machine CFS-GD700P
Brief description of the project: Hengshui Olive Oasis is a large-scale living community with perfect community functions in the western section of Hengshui. It is composed of three districts, A, B and C. It is surrounded by city parks, enjoys commercial and leisure facilities, and has a complete medical center built in the community.
Recalling the old ground before treatment, the ground was seriously sandy, the broken area was large, and there were more potholes. After inspecting the site and understanding the situation, Mr. Su Dong Su, the franchisee of Comfortex Hengshui, gave a specific treatment plan: firstly, open the surface with a grinding machine, secondly, repair the potholes, fill in the ground, and repeatedly sand the ground with grinding pads of different mesh to make it equal. The rigorous treatment method was recognized by the project manager, and at the same time, our professionalism was affirmed, and finally, we did not hesitate to choose the Comfortex brand.
A total of 25 floor grinding machines were used for the whole project. The project cycle lasted 55 days, with 30 days for curing the ground and the last 25 days for the design and construction of the parking lot traffic indication and guidance facilities, with integrated services to achieve perfect delivery.
Pre-construction After construction
Before and after construction, the effect is contrasting. The diamond crystal flooring treated with CFS flooring system is easy to clean and clean to save maintenance, dust-proof, pressure-resistant, wear-resistant, non-combustible, impermeable, corrosion-resistant, bright, environmentally friendly, freeze-thaw-resistant, and weather-resistant.
Effect show